Lummi K-12 School

Owner: 
Lummi Nation
Location: 
Gooseberry Point, Whatcom County, WA
Date of Work: 
2003 - 2004
Budget: 
$3,500,000
General Contractor: 
Flintco, LLC
Contact: 
Darrell Hillaire, Lummi Nation, 360.758.4218

This institutional project was originally designed and bid on a plan/spec basis.  Because it was seriously over budget, the owner elected to pursue a design-build process. 

Blythe was part of the successful project proposing team, and the complete project was built within budget with no reduction in scope.  Blythe added air conditioning to the scope of work, and Blythe’s design saved over $750,000 from the original design, which did not include air conditioning. 

Systems installed in the 120,000 sq. ft. project include variable air volume HVAC system with variable flow terminal units serving the classroom areas, variable air volume with fan powered constant volume terminal units serving the office areas, and constant air volume serving the gymnasium with demand ventilation; dust collection system for the wood shop; complete mechanical plant with boilers and chiller; and plumbing systems. 

Work was completed on schedule and within budget.

Lummi K-12 School--Blythe Plumbing & Heating, Inc., Bellingham